BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Clinton Township, Michigan. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

3.30 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter sidewalk and ramps, signal modernization, drainage improvements, signing and pavement markings on M-3 from 14 Mile Road to Wellington Crescent Boulevard, Macomb County. This Project includes a 5 year materials and workmanship pavement warranty. This project is an OJT VIP project. Please see Special Provision for Preparation and Consideration of Bids on On-The-Job Training Voluntary Incentive Program Projects.** 20611 Cb or Comb/Jt. 20611 Ba, Ea Control Sec Job No Federal No NH 50051 210076A 22A0779 Net classification required for this project is 20611 Cb or Comb/Jt. 20611 Ba, Ea In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of J. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2209 004 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter Sidewalk and Ramps and Pavement Markings on M-3

Award

Roads / Highways

$22,648,059.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
142
Bidding Soon
2,467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2022

April 3, 2023

Project location map

M-3, Clinton Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.