BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in East Lansing, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of January 4, 2023, the project has been awarded and construction is lsated to begin no earlier than March 13, 2023. 3.43 mi of hot mix asphalt cold milling and resurfacing, install pedestrian island and shared-use path, concrete sidewalk gap construction and ramp upgrades and pavement markings on Haslett Road from Deerpath Lane to Merritt Road, Burcham Drive from Abbot Road to Timberlane Street and at Marble Elementary and MacDonald Middle schools in the city of East Lansing, Ingham County. This is a Local Agency project. Control Sec Job No Federal No TA 33000 210609A 22A0683 TAU 33000 203624A 22A0678 ST 33000 205864A 22A0679 TAU 33000 213828A 22A0682 Net classification required for this project is 1703 Cb or Comb/Jt. 1703 Ea, J 2209 011 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Sidewalk Gap Construction and Ramp Upgrades and Pavement Markings on Haslett Road *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$1,833,810.00

Public - State/Provincial

Paving, Site Work

46

5

10

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
187
Bidding Soon
2,413
All Active Projects
948
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 2, 2022

March 13, 2023

November 15, 2023

img_map_placeholder

Multiple Locations, East Lansing, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.