BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Fortville, Indiana. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Owner reserves the right to accept or reject any bid or waive any informality or error in bidding for a period of 60 days from bid opening date. The Construction Manager for this project is AECOM Hunt, 2450 South Tibbs Ave, Indianapolis, IN 46241. METHOD OF BIDDING Project will be constructed under a Multiple Prime Contract Bids. BP-1 - Mass Excavation, Grading, and Site Utilities BP-2 - Foundations BP-3 - Structural Steel BP-4 - Roofing Bids shall be based on a "stipulated sum" basis in full accordance with Bidding Documents prepared by LANCER+BEEBE, LLC, 220 N. College Ave, Indianapolis, IN 46202. Note that other bid packages for the balance of the Project will be released in late September, 2022. Bids shall be accompanied by AIA Document A305 Contractor's Qualification statement. Bids shall be accompanied by Contractor's FiLEGALS nancial Statement specific enough and in such detail so that the Owner can make a proper determination of the Bidder's capability for completing the project if awarded. A Bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction" or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 5% of the total bid price and made payable to the Owner. Bids shall be accompanied by the Contract Responsibility Certification (reference specification section 00 21 00). Should Bidder withdraw his bid within 60 days from bid opening date without written consent of the Owner or fail to execute a satisfactory contract with the Owner, the Owner may declare the bid security forfeited as liquidated damages. Prior to execution of the Contract, Bidder shall furnish Performance Bond and Payment Bond in the amount of 100% of the Contract Sum. Bonds shall remain in full force and effect for 12 months from date of acceptance of the work. DOCUMENT AVAILABILITY: Documents will be available on a deposit basis while supplies last. After the supply is gone, documents will be available on a non-refundable basis only. DEPOSIT will be refunded in full upon return of Construction Documents to Architect/Engineer in good condition within ten (10) days after date of Bid Opening. Any questions concerning bidding the project shall be directed to Luke Johnson, AECOM Hunt, luke.johnson@aecom.com TIME OF COMPLETION Work will be completed by a phased approach process. Commence Work within 48 hours after signing contract or receiving a notice to proceed and completion of work as follows: Commence Grading and Site Utilities: September 6, 2022 Building Dry-in/Roof Substantially Complete: August 30, 2023 Project Substantial Completion: June 15, 2024 Final Completion: July 15, 2024 OTHER PROVISIONS Mt. Vernon Community School Corporation does not discriminate on the basis of race, color, religion, gender, national origin, age, or individuals with disabilities, including limited English proficiency, in its programs or employment policies as required by the Indiana Civil Rights Act (I.C. 22-9.1), Title VI and VII (Civil Rights Act of 1964), the Equal Pay Act of 1973, Title IX (Educational Amendments), and Section 504 (Rehabilitation Act of 1973). PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a 100% Performance Bond/Labor and Material Payment Bond in the amount equal to the contract price, and such bond shall comply with all laws of the State of Indiana governing public contracts let by governmental units Project will be constructed under Multiple Prime Contracts. Current Early Release Bid Packages: 1. Bid Package #E-02 - Concrete Foundations 2. Bid Package #E-03 - Structural Steel Previously-awarded Bid Packages: 1. Bid Package #01 - Mass Excavation, Grading, & Site Utilities (awarded to Millennium Contractors, LLC) 2. Bid Package #E04 - Roofing (awarded to Insley Systems, Inc.) Any questions concerning bidding the project shall be directed to Luke Johnson, AECOM Hunt, luke.johnson@aecom.com.

Post-Bid

Educational

$4,000,000.00

Public - County

New Construction, Site Work

33

14

6

2

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
65
Bidding Soon
1,007
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

April 3, 2023

img_map_placeholder

N 200 W, Fortville, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.