Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 22, 2024 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a pre-engineered storage facility in Fortville, Indiana. Completed plans call for the construction of a 10,112-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.
As of May 22, 2024, construction is complete. New transportation/maintenance building with a mezzanine Square footage: 10,112 SF (plus 1,650 SF for mezzanine) Owner reserves the right to accept or reject any bid or waive any informality or error in bidding for a period of 60 days from bid opening date. The Construction Manager for this project is AECOM Hunt, 2450 South Tibbs Ave, Indianapolis, IN 46241. METHOD OF BIDDING Project will be constructed under a Multiple Prime Contract Bids. BP-1 - Pre-Engineered Metal Building Remainder of Project will be bid under future Bid Packages in late 2022. Bids shall be based on a "stipulated sum" basis in full accordance with Bidding Documents prepared by LANCER+BEEBE, LLC, 220 N. College Ave, Indianapolis, IN 46202. PREPARATION AND SUBMISSION OF BIDS Bids shall be executed on State Form 96 and Supplementary Proposal Form included in the Project Manual. Bids shall be accompanied by AIA Document LEGALS A305 Contractor's Qualification statement. Bids shall be accompanied by Contractor's Financial Statement specific enough and in such detail so that the Owner can make a proper determination of the Bidder's capability for completing the project if awarded. A Bid security in the form of AIA Document A310, a certified check, Indiana General Revised Form No. 86, "Contractors Combination Bid Bond and Bond for Construction" or a form from an acceptable surety shall accompany each bid. The bid security shall be in the penal amount of 5% of the total bid price and made payable to the Owner. Bids shall be accompanied by the Contract Responsibility Certification (reference specification section 00 21 00). Should Bidder withdraw his bid within 60 days from bid opening date without written consent of the Owner or fail to execute a satisfactory contract with the Owner, the Owner may declare the bid security forfeited as liquidated damages. Prior to execution of the Contract, Bidder shall furnish Performance Bond and Payment Bond in the amount of 100% of the Contract Sum. Bonds shall remain in full force and effect for 12 months from date of acceptance of the work. Commence Work within 48 hours after signing contract or receiving a notice to proceed and completion of work as follows: Commence Grading and Site Utilities: September 2022 Erect Pre-Engineered Metal Building: Spring 2023 Project Substantial Completion: October 2023 OTHER PROVISIONS Mt. Vernon Community School Corporation does not discriminate on the basis of race, color, religion, gender, national origin, age, or individuals with disabilities, including limited English proficiency, in its programs or LEGALS employment policies as required by the Indiana Civil Rights Act (I.C. 22-9.1), Title VI and VII (Civil Rights Act of 1964), the Equal Pay Act of 1973, Title IX (Educational Amendments), and Section 504 (Rehabilitation Act of 1973). PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a 100% Performance Bond/Labor and Material Payment Bond in the amount equal to the contract price, and such bond shall comply with all laws of the State of Indiana governing public contracts let by governmental units
Occupancy
Warehouse / Distribution - Pre-Engineered Storage Building
$2,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2022
February 6, 2023
To Be Determined, Fortville, IN
Related To This Project
Fortville, IN
Bid Date: Feb 22 2023
Fortville, IN
Bid Date: Mar 22 2023
Fortville, IN
Bid Date: Mar 16 2023
Fortville, IN
Bid Date: Feb 28 2023
Fortville, IN
Bid Date: Mar 22 2023
Fortville, IN
Bid Date: Apr 18 2023
Fortville, IN
Bid Date: Apr 12 2023
Fortville, IN
--
Fortville, IN
Bid Date: Jan 31 2023
Fortville, IN
Bid Date: Feb 25 2021
Fortville, IN
Bid Date: Jul 15 2022
Fortville, IN
Bid Date: Jul 15 2022
Fortville, IN
Bid Date: Dec 21 2022
Fortville, IN
Bid Date: Oct 27 2021
Fortville, IN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.