Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a transportation facility in Kenner, Louisiana. Completed plans call for the renovation of a transportation facility.

The City of New Orleans (City) and New Orleans Aviation Board (NOAB) solicits quotes to obtain a contract for air compressor installations (Air Compressor Installations), for the South-side Terminal of the Louis Armstrong New Orleans (West Plant & West Plant Expansion) International Airport (South Terminal). The Contractor will be responsible for the replacement and installation of two (2) air compressors and two (2) driers for the air compressors. a. Air Compressor #1 (located at South Terminal West Plant) - Champion Duel 5 HP 34.6 cfm, 120-gallon horizontal tank with refrigerated air drier. b. Air Compressor #2 (located at South Terminal West Plant Expansion) - Champion Duel 5 HP, 40.4 cfm, 120-gallon horizontal tank with refrigerated air drier. 2. Contractor shall remove and dispose of existing air compressors and driers (including loading and hauling and all equipment/materials required to do so). 3. Contractor shall perform rigging of new equipment, including: (Drain down to be performed by facilities prior to shut down and removal.) a. Tie into existing pneumatic piping. b. Tie into existing electrical and existing building controls. c. Set new drain lines. (refill to be performed by facilities prior to start up) d. Start up and commissioning. 4. All materials shall be Original Equipment Manufacturer (OEM) or equivalent. 5. Contractor shall take all precautions to prevent any construction materials and debris from entering the secured air side of building. 6. SIDA badging and operational requirements and restrictions while working on an active airfield will be enforced. Access to airside work areas shall be through Gate 167. 7. Standard safety procedures shall be implemented, and contractor must ensure qualified personnel are assigned to successfully complete all tasks. 8. All work shall be completed within 60 calendar days of issuance of Notice to Proceed (NTP). 9. Contractor is to verify all dimensions and estimates for equipment. 10. Contractor shall notify MSY upon completion of work to schedule final inspection and acceptance, prior to issuance of final payment. Contractor to submit before and after pictures of the work areas.

Post-Bid

Transportation Terminals

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
105
Bidding Soon
986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2022

September 9, 2022

Project location map

1 Terminal Dr, Kenner, LA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed