BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Greenville, Michigan. Contact the soliciting agency for additional information.

The City of Greenville is seeking proposals from experienced and qualified vendors for professional services to conduct a cost of service rate study for the City's water utility and recommend changes to the rate structures and rate adjustments to fully cover the costs of operating, maintaining, and upgrading the water system The City of Greenville is seeking proposals from experienced and qualified vendors for professional services to conduct a cost of service rate study for the City's water utility and recommend changes to the rate structures and rate adjustments to fully cover the costs of operating, maintaining, and upgrading the water system. Sealed proposals will be received by the City of Greenville Clerk. Develop five-year financial plan for the water department a. Forecasting revenues and expenses over the planning horizon b. Identify cash flows and cash balances over the five-year period c. Identify and recommend a minimum cash reserve for utility d. Work with staff to incorporate the five-year capital improvement program and any potential debt issuances that may be required e. Develop a rate track identifying the annually changes required in rates to meet each utilities revenue requirements Identify the cost to serve each type of customer by meter size a. The cost of service study will be on a forecasted test year of 2023 b. Identify the customer (facilities) charges by meter size c. Identify the cost-based volumetric charges d. The cost of service study should identify the cost of providing public and private fire protection Rate Design a. Work with staff and the city council in development of the rate design b. Identify the potential impacts on customers resulting from changes in the rate design Presentations to staff and City Council a. Up to two (2) on site presentations of study results to City Council Timeframe a. The study and report should be completed within 90 days of award of the project and no later than January 1, 2023 All questions must be summited via email, to City Clerk Norice Rasmussen at ntrasmussen@greenvillemi.org The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
706
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2022

img_map_placeholder

Multiple Locations, Greenville, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.