Site work and paving for a civil project in Lakewood, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Work to be performed includes: Furnishing and Installing approximately 4,200 linear feet of 8-inch diameter ductile iron pipe, 50 linear feet of 6-inch diameter ductile iron pipe, fittings, fire hydrants, gate valves, appurtenances, replacement. and reconnection of existing water services, connections to the existing water main, and roadway restoration Work to be performed includes: Furnishing and Installing approximately 4,200 linear feet of 8-inch The District shall award a contract based on the lowest acceptable bid. It is the intent of the District to issue notice to proceed for this project during the week of August 22, 2022. Active construction activities shall not begin until enough material has been delivered to allowed for a continuous installation process ductile iron pipe, 50 linear feet of 6-inch diameter ductile iron pipe, fittings, fire hydrants, gate valves, appurtenances, replacement. and reconnection of existing water services, connections to the existing water main, and roadway restoration As a guarantee of good faith and as required by law, each Bid shall include a Bid Deposit in the form of cash, postal money order, certified check, cashiers check, or surety bond, payable to the order of the Lakewood Water District, for an amount not less than five percent (5%) of the amount ofsuch. Bid. Such Bid Deposits must be enclosed within the sealed envelope at the time the Bid is submitted to the District. Checks shall be made payable to Lakewood Water District Bidders shall hold their bid prices for forty-five (45) calendar days after bid opening. Deposits of the three low Bidders will be retained until a contract has been entered into between the successful Bidder and the District. The selected Contractor, prior to commencing work, shall furnish a Performance and Payment Bond m an amount of not less than the total Contract Price including the estimated taxes, W-9 form, and Insurance Certificates and Endorsements The Contractor agrees to perform the complete Contract work as specified, including corrections, finish and cleanup as follows: 1) Substantial completion of all work within 100 calendar days, beginning with the date given in the Notice to Proceed by the Lakewood Water District and 2) Completion of all work including corrective work, as required by the Districts final inspection within 120 calendar days of the date given in the Notice to Proceed. Failure to complete the work within the specified completion times may result in assessment of liquidated dam- ages as set out in Section 00500 Agreement. The Owner, Lakewood Water District, reserves the right to reject any and all Bids, waive any irregularities or informalities and accept any bid if such action is believed to be in the best interest of the District. Each Bid shall be submitted on the prescribed forms included with the Contract. Documents. All bidders must meet the requirements and include all parts listed in Section 00200 ofthe Bid Documents to be a qualified bidder. The Engineers Estimate for the base project is $900,000 to $1,200,000, including sales tax The project scope may be reduced some amount if the successful Contractors total bid price, including sales tax, for the project exceeds the available District funding. The Lakewood Water District is an Equal Employment. Opportunity employer. Minorities, women, and Pierce County small businesses are encouraged to participate. The Naomilawn,Newgrove, Highland Water Main Replacement Project #719 is a Prevailing Wage project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$1,111,111.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 16, 2022
August 22, 2022
Multiple Locations, Lakewood, WA
Related To This Project
Lakewood, WA
Bid Date: Jul 28 2022
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
Bid Date: May 25 2021
Lakewood, WA
Bid Date: May 03 2022
Lakewood, WA
Bid Date: Sep 15 2022
Lakewood, WA
Bid Date: Aug 17 2022
Lakewood, WA
Bid Date: Jul 07 2022
Lakewood, WA
Bid Date: Aug 02 2022
Lakewood, WA
--
Lakewood, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.