BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a municipal facility in Franklin, Massachusetts. Completed plans call for the renovation of a municipal facility.

In accordance with M.G.L. c. 149, it is the intention of the Town of Franklin to retain the services of a construction firm for replacement of the boilers at the Franklin Municipal Bldg. Contractor Qualification DCAMM Certificate All GC must submit a Certificate of Eligibility in HVAC from capital asset Management with the latest revised Commonwealth of MA, Division of Capital Asset Management (DCAMM) Update Statement. This project is for the replacement of the boilers at the Franklin Municipal Building. The HVAC and Electrical contractor shall be responsible for all associated work to accommodate the boiler installation. All work must be performed in accordance with the documents prepared by NV5.

Award

Municipal

$279,000.00

Public - City

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
642
Active Projects
341
Bidding Soon
4,565
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2022

September 23, 2022

Project location map

355 E Central St, Franklin, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.