BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Baltimore, Maryland. Contact the soliciting agency for additional information.

VISN 5 CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT 2023 TJS-Herman JV-36C24523D0038 MEM Contracting Inc.- 36C24523D0042 Guardian Environmental Service CO Inc. -36C24523D0043 Royce Construction Services-36C24523D0046 LG Construction Inc.- 36C24523D0047 GBD3JV -36C24523D0049 Mare Solutions Inc. -36C24523D0034 KAR Contracting LLC-36C24523D0036 Valiant Construction-36C24523D0048 American Veteran Industries LLC -36C24523D0035 RBVetco LLC-36C24523D0037 District Veterans Contracting Inc.- 36C24523D0039 ACTS-MELTECH JV1-36C24523D0040 NEI-LRC JV-36C24523D0041 Hamilton Pacific Chamberlain Inc.- 36C24523D0044 Veteran Design & Construction Inc.- 36C24523D0045 Note: Awardees are in no particular order. WV SEED PROJECT: AWARDEE - KAR CONTRACTING LLC -$837,386.00 (PENDING AVAILABILITY OF FUNDS) Note: The seed project for MD/DC will not be awarded. All contractors who receive an award will be given their minimum. ALL PROJECTS ARE SUBJECT TO THE AVAILABILITY OF FUNDS. **As of December 2, 2022, this project has not yet been awarded. The project is expected to be awarded on around January 2023.** Multiple Award Task Order Contract STATEMENT OF WORK DESCRIPTION OF WORK: The offeror shall furnish all labor, materials, equipment, and expert supervision needed to accomplish the work in accordance with the Description/Specifications/Statement of Work provided with each task order under the assigned NAICS code. Task Orders will vary in size and dollar amounts. Task Orders shall include, but are not limited to general construction categories which include maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving and earthwork, carpentry, concrete, roofing, site work, excavation, interior renovation, carpet-window and door installation, electrical, steam fitting, plumbing, exterior and interior painting, plaster/stucco, demolition, masonry or metal stud and sheetrock work, installation of acoustical ceilings and light fixtures, HVAC installation and flooring installation. Work may involve some or all of the above elements of work. While the MATOC is based on a general Statement of Work (SOW), it is anticipated that the SOW will be further defined in individual Task Orders issued under the resulting contract action. The contract terms and conditions, drawings and special conditions provided with the task orders shall apply. All work shall be initiated through Task Orders issued in accordance with FAR clause 52.216-18 Ordering as provided herein this solicitation document. A brief description of the various type of work to be performed under this MATOC is listed below: Maintenance, Repair & Alteration- general and specialized construction work on commercial and institutional buildings, specifically hospital constructions. Mechanical-maintenance, alterations, addition, installing, repair and replacement of plumbing, heating and air-conditioning equipment. Electrical-alteration, addition, maintenance, repair, installation of electrical wiring and equipment. Masonry- alteration, maintenance and repair of masonry work, stone setting, brick laying and other stone-work. Site Work-excavation, grading, demolition of buildings and other structures; earth moving and land clearing of buildings and non buildings. Roofing- alteration, maintenance and repair of roofs (spraying, painting or coating and installation of roofing and skylights). Renovation-addition, alteration, maintenance and repair in insulation, painting and wall covering work; flooring work, tile and terrazzo work and finish carpentry work. Drywall-maintenance, alteration, addition and repair in drywall, plaster work, and building insulation work. In addition to the insurance requirements required by FAR 28.307 and FAR 52.228-5, there shall be no exclusionary clauses added to this contract for any asbestos related work that would void the general liability insurance. The contractor will be working in and around an occupied and operating hospital. The contractor will be required to keep roads, walks and entrances to grounds parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Submittals regarding staging of equipment, crane placements, storage of supplies, etc are required. The resulting contract action will not provide for economic price adjustments. It is the intent of the resulting contract to utilize the contractor s overhead and profit percentages for the duration of this contract, for a period not to exceed one year from date of issuance/award. Each individual Task Order then becomes a Firm Fixed Price award for the duration of that Task Order. Task Order will contain specifications and drawings for the contractor to propose pricing. Each Task Order shall identify the applicable Davis Bacon Wage Rate Decision(s) applicable to the particular construction project. Payment and Performance bond requirements pertain to the issuance of Task Orders. Note FAR clause 52.228-15, all references to contract also includes any resulting Task Orders issued against the resulting contract. Fair Opportunity: Each awardee will be provided a fair opportunity to be considered for a task order unless one of the following statutory exceptions applies: The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays. Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized. The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order. It is necessary to place an order to satisfy a minimum guarantee. For orders exceeding the simplified acquisition threshold, a statue expressly authorizes or requires that the purchase be made from a specified source. Offerors should submit any questions they may have in writing to Alison Klein at alison.klein@va.gov. Prospective Offerors are advised that the pre-proposal site visit will be held solely for the purpose of explaining the concepts involved in the Seed Project as they apply for the offeror selected geographic area(s) and the specifications, terms, and conditions of this solicitation. Questions should not be asked at the site visit rather submitted in writing. NOTE: Offerors are encouraged to submit all questions and requests for clarifications no later than 3pm Eastern Time on September 30, 2022. The decision whether to respond to questions and requests for clarification made after September 30, 2022 shall be at the sole discretion of the Contracting Officer. Answers to questions and clarifications will be posted, along with the question on Systems for Award Management (SAM) web site at http://www.sam.gov. *Addendum 2 was uploaded for your review. RFIs were answered, drawings, layouts, and site visit sign in sheets were provided.

Award

Medical

$837,386.00

Public - Federal

Service, Maintenance and Supply

82

39

10

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
98
Bidding Soon
2,415
All Active Projects
971
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 19, 2022

img_map_placeholder

Multiple Locations, Baltimore, MD


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.