EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Somerset, Pennsylvania. Completed plans call for site work for a water / sewer project.

This bid is for the construction of a potable water main and appurtenances from the Somerset County Water System, Que Water Line, located along Pleasant Hill Road (T-546) to SR 281 near Mostoller's Convenience Store. The major components of the project include a 12-inch tap at the Que Line, three (3) steel cased road crossings, a precast concrete meter vault, 3,500 feet of 12-inch PVC water main & 700 feet of 6-inch PVC water main. A certified check or bank draft, payable to the order of the Somerset Township Municipal Authority, or negotiable U.S. Government Bond (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable Surety, in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with each Bid. Attention is called to the fact that no less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project; that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin or handicap; that a mandatory ratio of apprentices and trainees to journeymen is required in each craft and the Contractor (and any subcontractors) is obliged to make a "diligent effort" to achieve these ratios; and that to the greatest extent feasible, opportunities for training and employment be given lower income of the project area and must to the greatest extent feasible utilize project area businesses located in or owned in substantial part by project area residents. The Owner reserves the right to reject any or all bids or to waive any informality in the bidding. Bids may be held by the Owner for a period not to exceed 60 days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of Bidders, prior to awarding the Contract. All questions are to be submitted to the ENGINEER in writing. Questions may be faxed to 814-443-1368 or emailed to mlear@somersetengineering.com. Response to questions shall be in the form of written clarifications or addendum to the specifications and shall be delivered to each person receiving bid documents. The last day and time to receive questions will be at 11:00 a.m., Wednesday, August 24, 2022

Award

Water / Sewer

$536,386.00

Public - County

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Hazardous Waste Recovery Processes
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Gaskets, Joint Sealants
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Gas and Vacuum Systems for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
68
Bidding Soon
947
All Active Projects
405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

September 30, 2022

img_map_placeholder

PA-281, Somerset, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

SR 281 Corridor Waterline Extension Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.