BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in East Saint Louis, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Project has been canceled, due to flooding project turned into an emergency. The City will evaluate RFPs and make a selection based on the firm's technical ability, experience, and ability to perform the work. The City will not provide compensation or defray any costs incurred by any firm related to the response to this request. The City reserves the right to negotiate with any and all persons or firms. The City also reserves the right to reject any or all RFPs, or to accept any deemed most advantageous to the City, or to waive any irregularities or informalities in the RFPs received, and to revise the process schedule as circumstances arise. Proposals will be opened and tabulated on August 16,2022 at 11:00 A.M. in the Council Chambers at City Hall on the second floor. Mandatory Pre- Bid Meeting August 8, 2022 at 11:00 A.M. Public Works Building 213 North 20th Street East St. Louis, Illinois 62205 Latest Time to Submit- August 12,2022 Request for Interpretation Latest Time to Issue August 14, 2022 An Addendum Scope of Work: The proposed improvements consist of the removal and replacement of existing pavement, asphalt overlays, leveling binder, new aggregate base placement. Additional work included storm sewer removal and replacement, new storm sewer structures, structures adjust to grade, removal & replacement of sidewalks and curbing, curb & gutters, placement of ADA standard handicap ramps, curb shall be installed at all quadrants indicated on the intersection. Contractor shall strictly follow all rock compaction standards to prevent future pavement base faulting. Contractor shall provide by-pass pumping and dewatering as necessary. By making a proposal on the Project, the Bidder represents that the Bidder has examined the Scope of Work. Any questions about the meaning or intent of the specifications must be submitted four business days prior to the submission date August 16, 2021 to Lorenzo Thompson at 314-724-3127 or email at Lorenzo.thompson@tcivil.com. Each proposal shall be completed on the form furnished by the City.

Project Abandoned

Water / Sewer

$22,708,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
93
Bidding Soon
1,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2022

October 19, 2022

Project location map

N 83rd St & Marybelle Ave, East Saint Louis, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.