BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Farragut, Tennessee. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of September 20, 2022 this project has rebid but not yet been awarded. A timeline for award has not yet been established.** **As of August 25, 2022 this project has been cancelled. This project did not receive any bids from licensed contractors.** The Town of Farragut is requesting bids for Contract No. 2023-06, Kingston Pike Pedestrian Crosswalk Improvements. Scope of work is to install stamped asphalt crosswalks along the Kingston Pike corridor between Campbell Station Road and West End Avenue/Concord Road. The Town of Farragut reserves the right to accept or reject any and all bids. Contact Brannon Tupper, Assistant Town Engineer at 966-7057 for further information.' Bidders shall submit all questions in writing no later than Thursday, August 11, 2022 at 5:00 p.m. to Brannon Tupper, Assistant Town Engineer (btupper@townoffarragut.org). The Contractor shall within ten (10) days after the receipt of the Notice of Award and before the commencement of any operations hereunder executed, furnish the Owner with a performance and payment bonds in a sum equal to 100% of the amount of the contract price, conditioned upon the performance by the Contractor of all undertakings, covenants, terms, conditions, and agreements of this contract, and upon the prompt payment by the Contractor to all persons supplying labor and materials in the prosecution of the work provided by this contract. Such bond shall be executed by the Contractor and a corporate bonding company licensed to transact such business in the State of Tennessee and acceptable to the Owner. The expense of this bond shall be borne by the Contractor. If at any time a surety on such bond becomes irresponsible or loses its right to do business in the State of Tennessee, the Owner may require another surety which the Contractor shall furnish within ten (10) calendar days after receipt of written notice to do so. Evidence of authority of any attorney in fact acting for the corporate surety must be provided in the form of a certificate terminated and remains in full force and effect on the date of the bond. The form of the bond shall be subject to approval by the Owner. The work shall begin upon receipt of a written Notice to Proceed from the Engineer. Work shall be complete on or before November 18, 2022.

Award

Sidewalks / Parking Lot

$258,156.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
17
Bidding Soon
480
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

October 10, 2022

img_map_placeholder

Kingston Pike, Farragut, TN

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.