Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Moline, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
Job No. D-92-030-22, Phase II Engineering Services, I-74 at 0.9 Mi. S. of 23rd Ave to the Rock River Bridge Reconstruction/Rehabilitation in Moline, Rock Island County, Region Two/District Two. This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 2, 2022, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase II engineering services are required for the preparation of contract plans, specifications, and cost estimates for roadway reconstruction/major rehabilitation of I-74 from approximately 0.9 miles S. of 23rd Ave. to the Rock River Bridge in Moline. The existing interchange is a Cloverleaf design, and the proposed design is a Diverging Diamond Interchange (DDI). The proposed improvements may include reconstruction, widening and the addition of lanes along IL Route 5, existing I-74/IL5 interchange replacement, 27th St. reconstruction, 38th and 36th Avenue reconstruction and widening. The scope of work may include, but is not limited to, reconstruction, widening, proposed curb and gutter, ADA design/improvements, traffic signals, lighting, bicycle and pedestrian accommodations per Complete Streets Policy, culvert replacement, hydraulic/drainage re-analysis and or design, proposed ROW documents, and structure plans for multiple bridges. Coordination with other agencies is anticipated with this project. Phase II may include the preparation of detailed contract plans and all associated material, barrier warrant analyses, guardrail design, structure plans, roadway plans, typical sections, hydraulic reanalysis, storm sewer, drainage & utility plans, erosion control plans, traffic staging plans, signing plans, pavement marking plans, cross sections, lighting plans, traffic signal plans, special details, special provisions; quantities, cost estimates, estimates of time, Traffic Management Plan (TMP), Traffic Management Analysis (TMA) review and meetings between the design team and the District, PESA Response submittal, and all other incidental work required to complete the project. The estimated construction cost for this project is $81,700,000. The completion date for this contract will be 30 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Advanced Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 015 - RFQ - Phase II Engineering Services Rock River Bridge Reconstruction/Rehabilitation
Conceptual
Bridges / Tunnels
$81,700,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2023
I-74, Moline, IL
Related To This Project
Moline, IL
Bid Date: Jul 14 2022
Moline, IL
Bid Date: Aug 22 2022
Moline, IL
--
Moline, IL
Bid Date: Aug 18 2022
Moline, IL
Bid Date: Sep 01 2022
Moline, IL
Bid Date: Aug 22 2022
Moline, IL
Bid Date: Jul 29 2022
Moline, IL
Bid Date: Jul 20 2022
Moline, IL
Bid Date: Aug 02 2022
Moline, IL
Bid Date: Aug 03 2022
Moline, IL
Bid Date: Jun 09 2022
Moline, IL
Bid Date: Nov 06 2018
Moline, IL
Bid Date: Mar 02 2021
Moline, IL
Bid Date: Jul 20 2022
Moline, IL
Bid Date: Jul 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.