BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Pleasanton, California. Contact the soliciting agency for additional information.

The goal of the environmental services the City seeks through this RFP is to assist in the oversight and interpretation of all the regulatory requirements necessary to maintain Permit compliance associated with implementation of the City's SMP. This includes all regulatory agency notifications, reporting, biological surveys, monitoring, pre-maintenance work City staff trainings (as-needed), and Habitat Mitigation and Monitoring Plan (HMMP) implementation in accordance with regulatory agency Permits, along with the subsequent 6 years of maintenance/monitoring/reporting requirements associated with the HMMP. Duration of the contract(s) entered is anticipated to be at maximum seven (7) years in order to complete the HMMP monitoring and reporting requirements for the determination of mitigation area success. The purpose of the City's SMP is to maintain stormwater conveyance capacity in a total of 17 stream sections and eight (8) stormwater detention ponds located on City-owned properties and privately owned properties over which the City holds maintenance easements, (collectively referred to as Project Sites, see Table 1 of Attachment II for locations). The Project Sites range in settings from a concrete drainage channel, to a naturalized stream, to stormwater detention ponds. As needed, the City will periodically conduct the following maintenance activities to maintain flood and stormwater conveyance capacity (refer to Table 2 and Table 3 of Attachment II for more detail, frequency is ultimately determined by City staff assessment of need): o Weed abatement in detention basins and streams o Silt and Rock removal in detention basins or streams o Tule removal from streams o Riparian tree maintenance o Dewatering, if necessary Interview Notifications (if conducted) September 8, 2022 Conduct Consultant Interviews (if needed) September 12 - 14 Select Consultant - Begin Negotiations September 15, 2022 City Council Approval of Contract October 18, 2022 Start of Contract - Notice to Proceed Late October 2022 The City reserves the right to revise the RFP prior to the indicated due date. City may consider extending the due date for Proposal due to significant revisions to "Scope of Work."

Post-Bid

Municipal

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
89
Bidding Soon
1,890
All Active Projects
799
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 31, 2022

img_map_placeholder

Multiple Locations, Pleasanton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.