Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Appleton, Wisconsin. Completed plans call for the renovation of a detention facility.
Outagamie County is seeking bids from qualified contractors to provide and install a new toilet partition for two toilet rooms located on 5th floor of the Outagamie County Jail at 320 S Walnut St., Appleton, WI 54911. Requesting bids for a contractor to provide all materials and labor to replace toilet partitions in the Jail. Facsimile or email bids are not acceptable. The method for this procurement is competitive sealed bid, pursuant to 66.0901 and Chapter 22 and 50 of the Outagamie County Code of Ordinances. Outagamie County is seeking bids from qualified contractors to provide and install a new toilet partition for two toilet rooms located on 5th floor of the Outagamie County Jail at 320 S Walnut St., Appleton, WI 54911. Reference attachment "Female Huber ToiletRooms" for partition layout and photos. Contractor shall provide and install new toilet partitions in E and F blocks within 5th floor of the Jail. Scope of work shall include the following: Demo and site clear existing partitions. Save all grab bars, toilet paper dispensers, sanitary napkin receptacles or any other ancillary mounted items for re-use on new partition walls. The attachment showing the partition layout and photos is for reference only. Contractor shall site verify actual conditions. All new partitions shall be ordered to meet the needs of the actual or existing conditions. Due to Jail security requirements, all partition doors must swing out rather than in to prevent inmates from barricading themselves within the stalls. New partitions shall be galvanized steel partitions with a powder coat baked enamel finish. Owner to choose color from standard available colors. Partitions shall be manufactured by Accurate Partitions or shall be an alternate that meets or exceeds specifications of Accurate Partitions equipment. Associated hardware and mounting brackets shall be chrome plated, door hinges shall be continues and fasteners shall be tamper resistant with #25 Torx head. All floor mounting brackets shall be covered by a secure and decorative cover designed for these areas. Floor mounting and head rails should be mounted in a secure manner, similar to existing. Install salvaged grab bars, toilet paper dispensers, sanitary napkin receptacles or any other ancillary mounted items on new partitions. All work shall be completed in one days' time in order to limit disruption of Jail activities. Provide a one year warranty on parts and labor.
Award
Jails / Prisons
$7,519.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 23, 2022
September 22, 2022
320 S Walnut St, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Aug 03 2022
Appleton, WI
--
Appleton, WI
Bid Date: Aug 29 2022
Appleton, WI
Bid Date: Aug 31 2022
Appleton, WI
--
Appleton, WI
Bid Date: Jan 24 2023
Appleton, WI
Bid Date: Aug 24 2022
Appleton, WI
--
Appleton, WI
Bid Date: Aug 23 2022
Appleton, WI
Bid Date: Aug 23 2022
Appleton, WI
Bid Date: Feb 21 2022
Appleton, WI
Bid Date: Mar 21 2022
Appleton, WI
Bid Date: May 16 2022
Appleton, WI
Bid Date: Feb 07 2022
Appleton, WI
Bid Date: Apr 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.