BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in East Saint Louis, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of September 26, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** 2022 Sewer Rehabilitation Wilford Ave. 14th to "D" Streets City of East St. Louis ("The City") is soliciting proposals for the Rehabilitation of Various Streets in the City of East St. Louis as more fully set out in the Scope of Work section of this Request for Proposals ("RFP"). The city will evaluate RFPs and make a selection based on the firm's technical ability, experience, and ability to perform the work. The City will not provide compensation or defray any costs incurred by any firm related to the response to this request. The City reserves the right to negotiate with any and all persons or firms. The City also reserves the right to reject any or all RFPs, or to accept any deemed most advantageous to the City, or to waive any irregularities or informalities in the RFPs received, and to revise the process schedule as circumstances arise. Latest Time to Submit-Request for Interpretation - August 17, 2022 Latest Time to Issue An Addendum - August 19, 2022 SCOPE OF WORK SANITARY SEWER - A sewer has failed and caused a sewer backup in the easement as described above. The proposed improvement includes the removal and replacement of 340 LF of 8' clay tile with 8" PVC sewer rated pipe at this location. The sewer replacement shall be quoted at 5 feet deep. There are three trees that are in the easement that will need to be removed and hauled to the City's burn site on 59 th Street. STORM SEWERS - A depression in the pavement is directly over a storm sewer pipe. Contractor shall us all labor, equipment and materials to remove and replace an 18-inch pipe. Contract shall sawcut and excavate from a manhole to manhole. The distance is 261 lineal feet from manhole to manhole. Contractor shall provide a pavement section as indicated on the plans. Contractor shall strictly follow all rock compaction standards to prevent future pavement base faulting. Contractor shall provide by-pass pumping and dewatering as necessary. By making a proposal on the Project, the Bidder represents that the Bidder has examined the Scope of Work. Any questions about the meaning or intent of the specifications must be submitted four business days prior to the submission date August 16, 2021 to Lorenzo Thompson at 314-724-3127 or email at Lorenzo.thompson@tcivil.com. Each proposal shall be completed on the form furnished by the City. Time of Substantial Completion for the project shall not be later than 60 consecutive calendar days from date stipulated in written Notice to Proceed.

Award

Water / Sewer

$282,820.00

Public - City

Paving, Site Work

12

6

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
93
Bidding Soon
1,405
All Active Projects
624
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 22, 2022

October 21, 2022

December 20, 2022

img_map_placeholder

Wilford Ave, East Saint Louis, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.