Site work and paving for a civil project in Franktown, Colorado. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The Triview Metropolitan District, a Title 32 Special District is a quasi- municipal government and political subdivision of the State of Colorado, is in the final design phase of a project to construct and install a project known as the Northern Delivery System (NDS). The NDS is a 16 pipeline project that consists of 32,300 feet of 16 mater main, approximately 1,500 feet of Direction Boring Fusible PVC, 200 feet of Jack and Bore beneath State Highway 83, Installation of a 4.0 MGD Pump Station, connection to yard piping near the District s existing upper-level storage tank. The pipeline will be installed in both open fields, which must be reclaimed, and existing El Paso County roadways which will require road closures and detours, and full asphalt overlay upon completion of the pipe installation. as more fully described herein. The District expects to award a contract to the firm that has the most qualifications to serve as the CMGC and brings the necessary qualifications to oversee and perform the tasks required for completion of this $20,000,000 project on September 15, 2022. CMGC Services are expected to commence on that date and be completed by the end of third quarter 2024 The District reserves the right to act in its best interest and may terminate, modify, or suspend the process, reject any or all Proposals, modify the terms and conditions of this selection process and/or waive informalities of any submission. Project, the CMGC will likely be engaged under two separate contracts. While providing consulting services in response to this RFP during the design process, the CMGC will work under a professional services contract only (Phase 1) and must provide Rough Order of Magnitude Pricing (ROM) prior to October 12, 2022. When executing construction related services as a result of a negotiated scope and price, the CMGC will work under a construction contract (Phase 2).

Award

Water / Sewer

$20,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
36
Bidding Soon
953
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2022

May 1, 2023

img_map_placeholder

CO-83, Franktown, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.