BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Bell Gardens, California. Working plans call for site work for a playground / park / athletic field.

As of October 31st, 2022, project bid date was changed from September 23rd to November 04th 2PM PST Design-Construction Contract Time: TBD The project consists of the design and construction of the 4-acre Pritchard Field improvements that includes a new playground, swing station, splash pad, dog parks, walking trails, tree grove, office/restroom facilities, parking lot, art sculpture, native plant landscaping, picnic gazebos, LED light fixtures, and storm water devices. The successful contractor will be required to provide: (1) Liability insurance naming the City of Bell as additional insured; (2) 100% Faithful Performance Bond; and (3) 100% Labor and Material Bond. For questions, please contact Mr. Allan Perdomo, Director of Community Services, at (323) 923-2645. DESCRIPTION OF WORK The project consists of the design and construction of the 4-acre Pritchard Field improvements that includes a new playground, swing station, splash pad, dog parks, walking trails, tree grove, office/restroom facilities, parking lot, art sculpture, native plant landscaping, picnic gazebos, LED light fixtures, and storm water devices. The City of Bell is located in the southeastern portion of Los Angeles County. The City has an estimated population of 36,000 residents and covers an area of approximately 2.7 square miles. Pritchard Field is located on the North/East corner of Florence Avenue and Walker Avenue. It is approximately 4 acres in size and consists of playground, swing station, splash pad, dog parks, walking trails, tree grove, restroom/multi-purpose room building facilities, parking lots, art sculptures, shading, native planting landscaping, open lawn areas, storm water capturing devices, bioswales, and fitness gym. Other improvements include energy efficient LED luminaires for the park and parking lots and picnic gazebos with solar lighting. For additional information regarding the park improvements see Section 6 for Scope of Services.

Final Planning

Playgrounds / Parks / Athletic Fields

$4,000,000.00

Public - City

Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,265
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2022

March 6, 2023

img_map_placeholder

To Be Determined, Bell Gardens, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.