EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 13, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Soledad, California. Working plans call for the renovation of a water / sewer project.

** As of October 13, 2022. No bids were receive. No definite date for rebid.** The Contractor shall furnish all labor, including travel and per diem, materials, permits/licenses, non-consumable supplies, transportation, equipment, and every other item of expense necessary to perform calibration and troubleshooting / repair of Supervisory Control and Data Acquisition (SCADA) Computer System instrumentation at the Reverse Osmosis Potable Water Plant located at the California Department of Corrections and Rehabilitation (CDCR), Salinas Valley State Prison (SVSP), 31625 Highway 101 S., Soledad, California, 93960. Question due date - 8/12/2022

Final Planning

Water / Sewer

$54,477.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
23
Bidding Soon
725
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2022

April 13, 2023

img_map_placeholder

31625 US-101, Soledad, CA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Supervisory Control and Data Acquisition (SCADA) Computer System instrumentation at the Reverse Osmosis Potable Water Plant

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.