BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2022 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a mixed-use development in Doral, Florida. Working plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The owner has selected a Construction Manager. Doral Central Park Phase 2/3 and 4 Paint, BDA, Waterproofing, and Sportsfields (Turnkey) scope (3000 NW 87 Avenue, Doral, Fl 33172) Scope includes but not limited to: Turn-key electrical scope for entirety of park utilities, recreational center, and aquatics center. All subcontractors' bids in excess of $50,000.00 will be required to provide a payment and performance bond as an Add Alternate. The project has a minimum utilization goal of 12% SBE/DBE and 2.5% City of Doral ( Local Ordinance 2018-24, Sec 2-325) All bidders must be prequalified with Kaufman Lynn Construction prior to the bid due date. If not previously pre-qualified, the first (1) step for pre-qualification can be found at portal Once at the portal, follow the instructions. The first (1) step information will be reviewed against pre-established requirements in order to determine eligibility for the second (2) and final step administered Building Connected. Kaufman Lynn Construction reserves the right to waive informalities and to reject any and all bids.

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$2,350,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
114
Bidding Soon
1,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2022

March 9, 2023

Project location map

3000 NW 87th Ave, Doral, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.