Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 20, 2026 at 7:00 PM
Updated February 21, 2026
Site work and new construction of a detention facility in Doral, Florida. Design plans call for the construction of a 539,000-square-foot detention facility.
Construct a replacement LEED Silver certified detention facility with state-of-the-art security features, which will significantly improve inmate housing conditions, enhance the working environment for staff, and generate departmental savings through the replacement of the County’s oldest facility, the Pre-Trial Detention Center; the Master Plan Replacement Jail Project is divided into two phases across two separate sites; site 1, located at the current Training and Treatment Center, will include approximately 100,000 sq. ft. for a new Central Intake and Release Building with 4 courtrooms, 120,000 sq. ft. for MDCR Headquarters, and 20,000 sq. ft. of warehouse space; site 2 will feature a 300,000 sq. ft. facility, a 175,000 sq. ft. dormitory with space for programs and administration, a 24,000 sq. ft. Intake and Clinic building, 2 video courtrooms, a laundry building, 40,000 sq. ft. of warehouse space, and parking for staff and visitor As of February 20, 2026, this project is in the design phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Jails / Prisons
$393,978,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
13850 NW 41st St, Doral, FL
Related To This Project
Doral, FL
--
Doral, FL
--
Doral, FL
Bid Date: Sep 02 2022
Doral, FL
Bid Date: Aug 09 2022
Doral, FL
Bid Date: Jul 28 2022
Doral, FL
--
Doral, FL
Bid Date: Jul 25 2022
Doral, FL
Bid Date: Jul 18 2022
Doral, FL
Bid Date: Jan 31 2024
Doral, FL
Bid Date: Jun 28 2022
Doral, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
