Site work and paving for a mixed-use development in West Jordan, Utah. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; and water / sewer project.

The City is seeking a qualified design-build skatepark and bike park general contractor or team of contractors to design and build a new skatepark and bike park (Wheels Park) with an integrated stormwater detention basin (Park). The site location is 8600 S. and Fallwater Drive, West Jordan, UT. The location is the vacant property Southeast of the roundabout. The Park shall incorporate beginner and advanced wheeled activity recreation offerings (skateboards, BMX freestyle bikes, roller skates, mountain bikes, scooters, longboards, mountain boards, etc.) into the land adjacent to and doubling as the stormwater detention basin. All such questions should be received by September 6, 2022, @ 10:00 a.m. MST Answers to questions will be posted on the U3P which will then email the answer to all Offerors that downloaded the RFP. The City reserves the right to reject any or all proposals received, and to select the proposal deemed to be the most advantageous and in the best interest of the City. Non-acceptance of a proposal will mean that one or more others were deemed more advantageous to the City or that all proposals were rejected. The phase 1 budget is $4.0 million to be awarded with this RFP. The Contractor must guarantee their proposed cost for phase 1. Phase 1 of this project is expected to be completed from September 2022 through June 2023. Phase 2 of this project will be an additional $1 million to $1.2 million and is anticipated to begin immediately upon completion of phase 1. Phases 3 and 4 are to be determined and are dependent upon future funding but are expected in the future for the complete build-out of the Wheels Park area.

Award

Playgrounds / Parks / Athletic Fields

$5,200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
510
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

May 31, 2023

img_map_placeholder

8600 Fallwater Dr, West Jordan, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.