BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Porterville, California. Completed plans call for site work for a water / sewer project.

Contractor License Required: Class A - General Engineering The work to be performed under this contract includes furnishing of all labor, materials, and equipment to construct a new stormwater retention basin, relocate an existing recirculation basin, construct new storm drainage facilities, and perform miscellaneous site work and facility relocations to construct the project The new stormwater retention basin would be constructed north of Avenue 128/Teapot Dome Road, east of the Friant Kern Canal, south of the extension of Avenue 130, and west of Road 216. The approximately volume of the new stormwater detention facility is approximately 200 acre-feet. Approximately 556,000 cubic yards of material will be cut and 13,200 cubic yards of material filled to construct the stormwater retention basin. The approximate earthwork total is 569,000 CY. The recirculation basin relocation will result in the construction of a replacement recirculation basin between the new stormwater retention basin and the extension of the Avenue 130 alignment. The new recirculation basin will be approximately 15 ft deep, have approximately 3.8 acre-feet of storage, and include the relocated pump and pump discharge from the City's wastewater outfall. The project includes construction of a new 72-inch storm drain constructed between the terminus of an existing irrigation ditch, extending south along West Street, west along the extension of Avenue 130, and south along Road 216 to the new stormwater retention basin. For additional information, please contact either Corina Harris at (559) 781-4271, extension 1042 and corina.harris@tulerivertribe-nsn.gov, or Curtis Lam at (530) 848-3938, clam@hydroscience.com. In addition, any requirements doing work on this Project as stated in the CEQA document that directly or indirectly affect the performance of the contract shall be accounted for and included as part of the Contractor's operating conditions and scope of work. Please note this is a prevailing wage project. The successful bidder will have 210 calendar days to complete the Project from date of issuance of Notice to Proceed. Any questions regarding the type of work to be done are to be in writing via email directed only to Corina Harris at corina.harris@tulerivertribe-nsn.gov, and Curtis Lam at clam@hydroscience.com. Responses will be provided to questions submitted up until August 25, 2022 at 11:00 AM, and responses will be recorded, and answers may be distributed to all known bidders at the Tribe's option. The Owner, in its sole discretion, may waive or permit the cure of nonmaterial variances in the bid. Non-material variances include but are not limited to failures to comply that: (i) do not affect overall responsiveness, (ii) are merely a matter of form or format, (iii) do not change the relative standing, or otherwise prejudice other Contractors, (iv) do not change the meaning or scope of these Contract Specifications, or (v) do not reflect a material change in the requirements of these Contract Specifications. Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Tule River Indian Tribe, or cash from an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Tule River Indian Tribe, each for not less than one hundred percent (100%) of the contract price. Pursuant to the California The Owner reserves the right to modify the terms of these Contract Specifications at any time in its sole discretion. This includes the right to cancel these Contract Specifications at any time for any reason whatsoever prior to entering into a contract with the apparent successful bidder. The Owner reserves the right to obtain and consider information from other sources concerning the Contractor, such as the Contractor's capability and performance under other contracts, the qualifications of any Subcontractor of consultants identified in the bid, the Contractor's financial stability, past or pending litigation, and other publicly available information. Owner reserves the right to request, and the Contractor agrees to furnish, any additional data required to support the information contained within their bid.

Post-Bid

Water / Sewer

$200,000.00

Public - Federal

Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
22
Bidding Soon
364
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2022

October 31, 2022

img_map_placeholder

Multiple Locations, Porterville, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.