BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Aransas Pass, Texas. Completed plans call for site work for a water / sewer project.

Major items of work include the following: This project consists of installing approximately 665 linear feet of 10-inch waterline, 675 linear feet of 6-inch force main, horizontal directional drilling/boring, sending and receiving pits, tapping sleeves, fittings, and appurtenances in accordance with the contract documents, technical specifications, and plans. Ardurra reserves the right to process checks electronically by transmitting the amount of the check, routing number, account number, and check serial number to your financial institution. A bid bond by an acceptable surety, in the amount of 5% of the bid amount shall be submitted with each bid. A certified check or bank draft payable to the Owner or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. Attention is called to the fact that not less than the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the U.S. Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, age, or national origin. The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Owner for a period not to exceed 30 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. Performance and Payment Bonds are required of all Prime Contractors which enter into a formal contract in excess of $25,000 with the State, any department, board, agency, municipality, county, school district, or any division or subdivision thereof, the Prime Contractor is to obtain a Payment Bond in the amount of the contract before commencing with work and a Performance Bond for public works contracts in excess of $100,000.

Award

Water / Sewer

$137,947.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
215
All Active Projects
97
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

September 26, 2022

img_map_placeholder

Multiple Locations, Aransas Pass, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.