BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hanson, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. Project Manager - Renee Boucherie, P.E. User Division - Highway Design Approximate Fee - $350,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - Federal Funds (STP2) Project Length - Approximately 1.004 miles The purpose of this project is to improve safety, traffic flow, and function of KY-281. This section of KY-281 connects to the improved section of KY-281 near the I-69 Interchange and provides access to residential areas and businesses along this route. In addition, Carriage Lane serves as a link to Brown Road which houses James Madison Middle School and numerous residences. This portion of KY-281 contains geometric deficiencies, lacks pedestrian facilities, has drainage issues, and contains numerous access points within a tight corridor. The KY-281/Carriage Lane intersection has extremely deficient site distance issues and geometric deficiencies. This project is needed to provide a safe and reliable route for those accessing businesses along KY-281, a nearby school, and residential areas in the northeast quadrant of Hopkins County The Consultant team shall include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. The plan should demonstrate how DBE companies will be mentored or used to assist in the area(s) pertaining to this contract. If included, an additional page will be allowed in the Project Approach Section 7) to exhibit this plan. A maximum of four (4) points will be considered in the Evaluation Factors for the DBE Participation Plan First Selection Meeting: September 2, 2022 Final Selection: September 21, 2022 Pre-Design Conference: September 28, 2022 Consultant Fee Proposal: October 7, 2022 Contract Negotiations: October 19, 2022 Notice to Proceed: November 9, 2022 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
52
Bidding Soon
656
All Active Projects
310
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2022

img_map_placeholder

KY-281, Hanson, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.