BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2022 at 8:00 PM

Updated August 29, 2024

Site work and paving for a mixed-use development in Pensacola, Florida. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description: This is a FEMA funded project. The purpose of the project is to repair Hurricane Sally Damage to the Glynn Key Pond. The pond is located in the vicinity of N Navy Blvd and Cameron Ln (30.39, -87.28). The damage is located at SW corner. Tasks include: Re-grade, reconstruct and stabilize eroded area adjacent to the southwest fence line, repair a section of asphalt pavement, remove and replace damaged fencing. NUMBER 170001-011

Final Planning

Roads / Highways

$82,468.00

Public - County

Paving, Site Work

14

9

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
36
Bidding Soon
747
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2022

September 28, 2022

Project location map

400 N Navy Blvd, Pensacola, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.