BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Edward, New York. Completed plans call for site work for a water / sewer project.

Washington County Sewer District #2 (WCSD#2) is soliciting bids for the Route 197 Force Main Replacement Project with Labella Associates acting as the project engineer. The enclosed documents are for the replacement of a sanitary sewer force main and necessary accessories, and replacement of a pump station control panel in the Village of Fort Edward, Washington County, New York. The force main is suspended under the Route 197 (Bridge Street) Bridge that connects Rogers Island to Fort Edward, NY. A contract will be signed between WCSD#2 and the Contractor. Attached is a set of plans and technical specifications to be used for bidding purposes. Please read carefully and submit a sealed bid per the Instructions to Bidders. Work will begin upon the signing of a contract between the WCSD#2 and Contractor. Estimated start date for this project is September 12, 2022. An estimated ending date must be included with the bid. This may be a factor when awarding the bid. Questions and requests for clarifications should be submitted via email to jdenno@washingtoncountyny.gov no later than August 23, 2022. Answers to questions and requests for clarifications will be compiled and posted as an addendum on the County's website no later than August 25, 2022, 4:30 PM Contract term: Completed by 12/31/2022 Purchases by the County of Washington are not subject to any Sales tax, Federal Excise Tax, or Transportation Tax. Bid price will be net at point of delivery indicated in bid. All material must be furnished as per bid and detailed specifications attached. Contracts will be awarded to the lowest responsible bidder barring any rejections or waiving of informalities in any or all bids. Obtaining the necessary work permits from the NYSDOT and NYS Canal Corporation. Removing and replacing the existing Force Main suspended from the bridge (total length approximately 385 LF) and all appurtenances including expansion joints, air vacuum release valve, heat trace, and vertical risers to the buried force main. Replacing pipe support brackets and hangers as needed if significant deterioration is noted during pipe installation. Providing electrical connection and service for the proposed heat trace, including coordination with National Grid. Replacing existing duplex control panel at Rogers Island Pump Station.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Site Work

12

5

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
50
Bidding Soon
888
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

September 12, 2022

img_map_placeholder

NY-197, Fort Edward, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.