BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a mixed-use development in Fort Washington, Pennsylvania. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

This project will include installation of traffic signal equipment in three stages. Stage 1 will install underground conduit/junction boxes/controller pad and order mast arms before a General Contractor is selected for curb/widening work. Stage 2 will coordinate with a General Contractor to be selected with an independent contract for installation of mast arm/pedestal/pedestrian stub pole foundations. Stage 3 will install mast arms/controller/signal equipment after the General Contractor has completed curb/widening work. Clarification Deadline: 9/12/2022 4:00 PM

Award

Roads / Highways

$305,658.00

Public - City

Site Work

34

15

4

3

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
964
Active Projects
499
Bidding Soon
7,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

November 7, 2022

Project location map

Camp Hill Rd & Virginia Dr, Fort Washington, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.