Published October 12, 2022 at 8:00 PM

Updated September 15, 2023

Site work and new construction of a mixed-use development in Belleville, Michigan. Working plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for the construction of a playground / park / athletic field; and sidewalk / parking lot.

As of October 12, 2022, project is on hold. No definite date for the rebid. Estimated Budget 1.6 million. New Mechanical Building with ADA compliant restroom, Slide Complex Surge Tank, Pump Pit with staircase and associated Architectural, Structural, M. E. P., site civil infrastructure and landscape. Project includes construction of slide complex water reclamation apron, patron queuing, concrete and deck pathways. Contractor shall include complete mechanical filtration system and associated pumps and piping as shown in the contract plans and specifications. The Owner has pre-purchased the slide. Contactor will be responsible for the construction of the Slide Complex infrastructure of concrete columns and footings. Questions shall be submitted in written form to the Project Contact via e-mail : Laura Martin, e-mail address laura.martin@metroparks.com Contractor deadline for submitting questions will be 4 pm ET, August 23, 2022. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % Job Location Lower Huron Metropark Question Acceptance Deadline 08/23/2022 02:00 PM EDT Questions are submitted online No

Final Planning

Playgrounds / Parks / Athletic Fields

$1,600,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer Qualifications, Fabricator Qualifications, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Roofing and Siding Panels, Metal Roof Panels, Siding, Flashing and Sheet Metal, Flexible Flashing, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Fluid-Applied Flooring, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Facility Fuel Systems, Facility Fuel Piping, Facility Natural-Gas Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Air Outlets and Inlets, Central Heating Equipment, Breechings, Chimneys, and Stacks, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Vibration and Seismic Controls for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Unit Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
91
Bidding Soon
1,593
All Active Projects
721
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

March 12, 2023

img_map_placeholder

17877 Savage Rd, Belleville, MI

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Turtle Cove New Slide Structure

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.