BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in San Diego, California. Completed plans call for the construction of a 305,000-square-foot educational facility; 82,000-square-foot parking garage; for the demolition of a educational facility; for site work for a nine-acre educational facility; and retail development.

As of November, 2023, construction is underway and expected to be completed in 2026, however, an exact timeline for construction has not been confirmed. Project consists of new specialized instructional support, student health and well-being services, including mental health, and other student academic services and resources. Scopes also includes an alumni and welcome center, multi-purpose space for various campus programs, public realm improvements, and structured parking. Project will redevelop 9.2-acres that are currently occupied by Myers Drive, Rupertus Lane/Walk, Russell Lane, and eight separate structures. The project replaces the old structures with new, higher-density, sustainability-focused buildings, anticipating 305,000 GSF of building and 82,000 GSF of structured parking / loading dock: 1. Student Health, Mental Health and Well-Being 2. Student Academic Resources Building 3. Alumni and Welcome Center 4. Multi-Purpose Building (Gallery, Celebration space, Parking, Flexible Academic space) The project would also include a small amount of retail space in support of enrollment growth, such as grab-and-go food options or other on-site services.

Under Construction

Educational

$428,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
82
Bidding Soon
1,188
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2022

November 6, 2023

img_map_placeholder

9500 Gilman Dr, San Diego, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.