BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Cherry Point, North Carolina. Completed plans call for the renovation of a warehouse / distribution facility.

GET/Terracon Project No. K3227001 Project No.: 7233832 Title: Climate Control Storage F35 B149 NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction Contractors, 39.5 Million Contract Completion Date: 180 days after award Estimated Cost Range: Between $250,000 and $500,000 Wage Determination: General Decision Number: NC20220065 02/25/2022 Liquidated Damages: $271.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Monday, 15 August 2022 at 9:00 AM Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. Climate Control Storage F35 B149 REQUEST FOR PROPOSAL MCAS Cherry Point, North Carolina Project No. 7233832 8/9/2022 FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. Proposal Due Date: 30 August 2022 @ 2:00 PM EST E-Mail Address for Proposals: is listed below: 1. roicc_chpt_ktr_bids@navy.mil 2. ericka.j.bishop.civ@us.navy.mil 3. linda.b.clark14.civ@us.navy.mil *Note: Proposals must be sent to ALL of the above email addresses. Subject line should contain the project number and contractor name. Proposals may also be hand-delivered to Building 87 and must be stamped/signed in by proposal due date and time. Requests for Information (RFIs): RFIs must be submitted by the prime contractor to the email addresses above. The cut off for RFIs is 20 August 2022 by 9:00 AM EST in order to process all inquiries by the proposal due date. The specifications and drawings are posted as attachments on https://sam.gov/. "OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT AVILABLE, NO AWARD WILL BE MADE AS RESULT OF THIS SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM THIS SOLICITATION." *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work is for Building 149. It is is a 41,300 square foot warehouse with multiple bays that stores military equipment and components. The purpose of the project is to provide a climate controlled space within an empty work bay of Building 149 for storage of F-35 Hazardous Materials. The storage space must meet the requirements of F-35 Lightning II Facilities Requirements Document attached in this Scope of Work (SOW). Construction must be completed by January 2023. The project includes HVAC, fire protection, plumbing fixtures, lighting, electrical outlets, and telecommunication. and incidental related work.

Post-Bid

Warehouse / Distribution

$500,000.00

Public - Federal

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
25
Bidding Soon
333
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

October 31, 2022

img_map_placeholder

To Be Determined, Cherry Point, NC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.