Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 19, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a playground / park / athletic field in Aurora, Illinois. Conceptual plans call for site work for a playground / park / athletic field.
Description of Work Name: Multi-Use Sculpture Proposed Services: The City of Aurora will be commissioning a Public Art sculpture in the Sculpture Park adjacent to the David L. Pierce Art & History Center at 20 E. Downer Place. The sculpture design chosen for this project will double as creative seating and/or be otherwise interactive for the public. The sculpture must be professionally engineered, to the City's satisfaction and approval, to avoid standing water and to accommodate required safety and liability concerns. Poured concrete is encouraged but not required; multiple, staggered, repeating forms are encouraged but not required. Specific forms should originate in concept from a reference to the history, culture, and/or natural environment of Aurora Illinois. This application process is a request for qualifications based on previous, similar work; this is not a request for a design. Artists may include an optional rough concept for the project with their application if they wish; all intellectual property belongs to the Artist. Should an Artist be selected for this project, they will then be paid to design a site-specific sculpture, in their own established style, to be approved by the City before implementation. Proposer Instructions 1. Pertinent forms and documents are available online 2. The City reserves the right to waive technicalities and to reject any or all responses. 3. Any respondent who owes the City money may be disqualified at the City's discretion. 4. The City encourages minority business firms to submit qualifications and encourages the successful contract bidder to utilize minority businesses as subcontractors for supplies, equipment, services, and construction. 5. Submission of qualifications shall be conclusive assurance and warranty the bidder has examined the pertinent forms and documents as well as all requirements for the performance of work. The respondent will be responsible for all errors in the submittal resulting from failure or neglect to conduct an in-depth examination. The City will, in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the respondent. The method of contractor selection has not been determined at this time
Conceptual
Playgrounds / Parks / Athletic Fields
$70,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2023
To Be Determined, Aurora, IL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
