BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a civil project in Toledo, Ohio. Completed plans call for site work for a water / sewer project.

The Q&A deadline is extended accordingly to September 8, 2022 at 5:00 p.m. Project Type Bid License Requirements No Specific Requirements Liquidated Damages $400/day Start/Delivery Date December 31, 2022 Project Duration 3-4 weeks Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 08/23/2022 5:00 PM (EDT) Hoffman Road Landfill Gas Collection & Control system construction. Work includes drilling replacement wells, horizontal/trench well construction, installing associated piping, making completed well connections for vacuum, air and forcemain, providing/installing new pumps, wellheads and all necessary fittings. Additional work includes reconfiguring lids for leachate collection risers. If using a check as the bid guaranty, the check must be scanned and uploaded with your bid. In addition, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. No Company checks / No Personal Checks will be accepted. Checks shall be made payable to City of Toledo. If your company does not provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09) City of Toledo Division of Purchases and Supplies One Government Center, Suite 2000 640 Jackson Street Toledo, OH 43604 City forms must be filled out and attached to the bid: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate; Best Bid Criteria); Signed Contract by Vendor CEO/President; Current Workers Compensation Certificate; Insurance Certificate listing the city of Toledo as an additional insurer; Child Support Affidavit; and Tax Exemption Certificate. The Work shall commence within ten (10) days, and be Substantially Completed within 45 days from the Notice to Proceed and fully completed within 60 days from the date of Substantial Completion Question Deadline 08/30/2022 at 5:00 PM

Bid Results

Water / Sewer

$342,758.00

Public - City

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
104
Bidding Soon
1,327
All Active Projects
565
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

November 14, 2022

img_map_placeholder

Hoffman Rd, Toledo, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.