BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in San Jose, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Engineers Estimate for this Work ranges from $3M to $3.5M. The estimated cost of construction for the Project is in the range of $2 million to $4 million. The project scope includes upgrades to 42 existing bus stops within Santa Clara County and the construction of a new pedestrian fence barrier at the Eastridge Transit Center. Upgrades to the bus stops include but are not limited to the removal of existing transit shelters, benches, and trash receptacles in addition to the removal and replacement of PCC sidewalk, bus pads, curb/gutter, minor signage/striping upgrades, and the installation of VTA-furnished transit shelters and benches. The scope of work at the Eastridge Transit Center includes construction of a new 4' high metal picket fence with a median island at the base of the fence along with minor striping upgrades. The Project will also require Bidder to: 1. Have ten years of experience as a licensed Class A (General Engineering) Contractor 2. Have two years' experience with a government agency The work will include furnishing all labor, supervision, materials, and equipment necessary to construct the Project. The Bus Stop Improvement Program is an ongoing effort to upgrade bus stops throughout the VTA system by improving amenities at bus stops to increase safety, security, and access to respond to customer requests and field review findings. The Program is guided by the policy guidance established by the Transit Passenger Environment Plan (TPEP), compliance with the provisions of the Americans with Disabilities Act (ADA) as it relates to public facilities, and the language regarding bus stops, and passenger amenities as a part of the 2016 Measure B program. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Milestone 1: Contractor completes construction of the Eastridge Transit Center pedestrian fencing : $1,000 per additional calendar day beyond 6/30/23 Milestone 2: Contractor completes all improvements listed under bid Form 1 for Milestone 2.The Bus Stop locations are: $1,000 per additional calendar day beyond 6/30/23

Award

Sidewalks / Parking Lot

$3,345,052.00

Public - County

Paving, Site Work

40

34

4

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
78
Bidding Soon
1,503
All Active Projects
652
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.