BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Collins, Colorado. Completed plans call for site work for a water / sewer project.

The City of Fort Collins is requesting a Statement of Qualifications (SOQ) from qualified Contractors to provide services related to construction for the Mail Creek Stream Rehabilitation and Enhancement Project. General Requirements - Bidder Prequalification/Preregistration Required - Insurance Required - Local Service Required Question Acceptance Deadline 08/18/2022 05:00 PM EDT Questions are submitted online No Project Schedule: The schedule for construction of the Mail Creek Stream Rehabilitation Project is primarily dictated by the flood season and raw (ditch) irrigation water restrictions. The project schedule is anticipated to begin in early December 2022 through April 15, 2023. Location Mail Creek reach 1-1 is located just northwest of Fossil Creek Community Park in southeast Fort Collins. This segment of stream flows across land owned by the City of Fort Collins Natural Areas (Two Creeks Natural Area) and Parks Departments (Fossil Creek Community Park) and one private property owner. The upstream limit begins at the east side of the Mail Creek Lane roadway bridge and extends down through Two-Creeks Natural Area to the confluence of Fossil Creek. This reach is approximately 3,200 lineal feet of channel. The Mail Creek stream project is the next planned stormwater project in the Stream Rehabilitation and Enhancement Program (SREP). Several significant problems related to flooding, public safety, water quality, habitat function and impacts to riparian area exist within this project. The Mail Creek stream reach is within an urbanized corridor and is experiencing severe bed and bank erosion, which in some cases, is threatening private property. Reconstruction, using bioengineered stream sections, typically including replacement of existing grade control structures and disconnected channel segments with riffle drops and pools to promote native fish passage and improve aquatic and wildlife habitat will be utilized.

Post-Bid

Water / Sewer

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
40
Bidding Soon
926
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2022

October 28, 2022

img_map_placeholder

Multiple Locations, Fort Collins, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.