BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Midland, Ontario. Conceptual plans call for the renovation of a water / sewer project.

The Midland WWTC is operated under Environmental Compliance Approval (ECA) No. 5708-A72SPG and has an average rated capacity of 15,665 m3/day and a peak rated capacity of 37,000 m3/day. The plant is a conventional activated sludge plant and provides secondary treatment for industrial and domestic wastewater. It generally consists of the following treatment units: - Fine screening and grit removal in the headwork's building. - Primary clarification in three (3) circular clarifiers. - Aeration in six (6) aeration tanks with mechanical aerators. - Secondary clarification - Chlorination using liquid chlorine (sodium hypochlorite). - De-chlorination using calcium thiosulphate. - Sludge digestion using anaerobic digestion with one (1) primary and two (2) secondary digester. - Storm equalization with 1,400 m3 rectangular tank and overflow chlorination. - Septage Receiving with two (2) receiving tanks each with a volume of 136 m3. The Town has not been able to store an efficient volume or pressure of biogas to utilise the dual gas boiler for heating the process and administration building. The current floating lid has suspected leaks at the seems of the panels. Time is off the essence with this project as the Town has an immediate need to have the system in place. It is anticipated the final design be completed during February of 2023, and installation June of 2023. All inquiries and questions concerning this Request for Proposal including specifications, process and results must be directed in writing to procurement@midland.ca before August 22, 2022. Tender has been cancelled. If/when the project will be re-tendered is undetermined at this time. The Town has determined that it would be in the best interest of this project to cancel the solicitation and reject all proposals.

Project Abandoned

Water / Sewer

$100,000.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
41
Bidding Soon
1,189
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

December 1, 2023

img_map_placeholder

200 Bay St, Midland, ON

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.