Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 16, 2022 at 7:00 PM
Updated January 23, 2025
Renovation of a mixed-use development in Kingston, Ontario. Completed plans call for the renovation of a 13,500-square-foot conference / convention center; and educational facility.
The Scope of Work includes, but is not limited to replacement of approximately 13,500 square feet of roof, the removal and reinstatement of existing roof top equipment and the eventual replacement of existing roof top mounted cooling towers (x2) and the installation of a new condenser unit. The intent of the project is to replace the existing roof areas on the Donald Gordon Center, including, but not limited to, ballast, insulation, membrane, flashings, counter-flashings, drains and vents. The new roof will consist of an inverted, built-up, roof membrane system on the majority of the areas with 2-ply mod-bit roofing system on the remaining areas. The removal of the cooling towers and installation of the new condenser unit will likely need to take place at the end of the project schedule due to delivery lead times of equipment.
Award
Conference / Convention Centers
$1,972,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 12, 2022
November 11, 2022
421 Union St, Kingston, ON
Related To This Project
Kingston, ON
Bid Date: Apr 13 2023
Kingston, ON
Bid Date: Oct 12 2022
Kingston, ON
Bid Date: Oct 12 2022
Kingston, ON
Bid Date: Oct 01 2024
Kingston, ON
Bid Date: Oct 06 2022
Kingston, ON
Bid Date: Nov 10 2022
Kingston, ON
Bid Date: Aug 31 2022
Kingston, ON
Bid Date: Oct 13 2022
Kingston, ON
Bid Date: Sep 14 2022
Kingston, ON
Bid Date: Sep 22 2022
Kingston, ON
Bid Date: Oct 26 2022
Kingston, ON
Bid Date: Nov 15 2022
Kingston, ON
Bid Date: Dec 06 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
