BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2022 at 8:00 PM

Updated October 24, 2023

Demolition and site work for a municipal facility in Greenville, Pennsylvania. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Contract work generally consists of demolition of two adjoining buildings, termination and marking of existing utilities, and site restoration. Equipment and Services to be provided shall be according to the specifications which are on file at the office of KLH ENGINEERS, INC., 5173 Campbells Run Road, Pittsburgh, Pennsylvania, 15205, and at the Town Office. Work under 2022-05 covers the furnishing of all labor, material, plant, utilities, and services required for the demolition of 132 Main Street in the Town of Greenville. Work shall include the removal of all materials and debris from the property on which the structures were located. Due to the advanced disrepair of the project, no asbestos survey was done. CONTRACTOR to presume all materials to be taken to an asbestos disposal suited facility. B. The demolition project is located in the Town of Greenville, Mercer County. C. In general, the total demolition will consist of, but shall not be limited to, the following: 1. Obtaining all required permits for demolition. 2. Termination of all utilities (gas, water, electric, telephone, sanitary sewers, storm sewers, etc.). Utilities are to be marked on site and locations supplied to OWNER digitally. 3. All erosion and sedimentation control devices. 4. Asbestos abatement, if necessary and as required by Mercer County Health Department or another controlling agency. 5. Demolition of buildings and structures, including the conventional spread footings and caissons. 6. Demolition of walks and steps, except sidewalks along the streets. 7. Backfilling and subsequent compacting of all subsurface areas and surface depressions (basements, wells, cisterns, cesspools, etc.). 8. Removal of all materials of any kind from the project, including all debris and rubbish, as it accumulates and not stored on the site(s) 9. Furnish, erect, and maintain barricades, fences, lights, flashing warning lights, and warning "KEEP OUT" signs. 10. Dust prevention and control. 11. Site cleanup and treatment of disturbed areas.

Award

Municipal

$48,600.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
145
Bidding Soon
2,066
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 3, 2022

Project location map

132 Main Street, Greenville, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.