BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fitness / recreation center in Twentynine Palms, California. Completed plans call for the renovation of a fitness / recreation center.

The City of Twentynine Palms (City) is seeking proposals from qualified manufacturers, which are regularly engaged full-time in the manufacture or production of this and similar items and have a history of successful manufacture or production acceptable to the owner (City). Proposals will provide for design and installation services for the Project Phoenix Community Center Buildings permanent, manually operated telescoping bleachers (Project). The manufacturer will act as the project manager responsible for architecture, design, engineering and installation required for securing entitlements and building permits, construction documents, construction observation and services associated with the design, manufacture and installation of permanent telescoping manually operated bleachers at the Project Phoenix Community Center Gymnasium in the downtown area of the City. These services will be funded in part or in full, through a grant from the federal Community Development Block Grant Program (CDBG), administered by the City of Twentynine Palms. The primary purpose of CDBG program is the development of viable communities by providing decent housing, suitable living environments, and expanding economic opportunities, principally for low and moderate-income people. The manufacturer selected will be responsible for complying with certain terms and conditions of the federal grant (see Bid Packet Documents). The City contact for this Request for Proposal is Frank J. Luckino, City Manager, and is the sole point of contact for this procurement.All communication shall be in writing and submitted to Mr. Luckino via e-mail at fluckino@29Palms.org. Questions will be accepted up to seven (7) calendar days from the due date of the proposal submission. The method of contractor selection has not been determined at this time.

Award

Fitness / Rec Centers

$87,940.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
20
Bidding Soon
363
All Active Projects
178
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

September 15, 2023

img_map_placeholder

To Be Determined, Twentynine Palms, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.