Site work and renovation of a water / sewer project in Des Moines, Iowa. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

All bids rejected by owner The work includes, but is not necessarily limited to: 1. Disassembly and removal of existing head and idler shafts, primary and secondary drive sprockets, collector chains, flight boards and miscellaneous related sludge collection equipment from lower level of Treatment Basin No. 1. 2. Handling and storage of all salvaged materials in staging area(s) shown on Plans. 3. Reinstallation of new or refurbished sludge collection equipment provided by the Owner including shafts, sprockets, collector chains, flight boards and miscellaneous equipment and attachments. 4. Installation of new electric motors and gearboxes and rebuilding existing drive system for sludge collection equipment. 5. Alignment and adjustment of assembled equipment as necessary to achieve proper function. 6. Demolition of existing process water piping and appurtenances and installation of new process water system. 7. Removal and proper disposal of all unused equipment and materials from the Project site. The construction of the improvements shall be in accordance with the project plans and specifications and general stipulations for said improvements as approved by the Board. The Proposal shall be made out on a preprinted form furnished by the Board and must be accompanied in a separate envelope by a Bid Bond or other security ("bid security") permitted by statute. The amount of the bid security shall be ten percent (10%) of the bid submitted by the bidder. The bid security shall be made payable to the Board. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the Board as liquidated damages in the event the successful bidder fails or refuses to enter into a Contract within ten (10) days after the award of Contract and post bond satisfactory to the Board. The Contractor's Bond shall be in an amount equal to one hundred percent (100%) of the Contract price, be issued by a responsible surety approved by the Board, guarantee the faithful performance of the Contract and the terms and conditions therein contained, protect and save harmless the Board from claims and damages of any kind caused by the operation of the Contractor, guarantee materials and workmanship to be free of defects for a period of two (2) years from and after completion and acceptance by the Board, guarantee surface restoration work in public right-of-way to be free of defects for a period of four (4) years from and after completion and acceptance by the Board, and shall otherwise in all respects comply with the Code of Iowa. The Board reserves the right to defer acceptance of any Proposal for a period not to exceed forty-five (45) calendar days from the date of receipt of bids. The Notice to Proceed will be issued after the Contract is signed and the Contract, the Contractor's Bond, and the insurance certificates required by the Contract are received by the Board. Work shall begin within ten (10) calendar days after the date set forth in the written Notice to Proceed. The improvements shall be completed within seventy-five (75) consecutive calendar days from the date set forth in the Notice to Proceed. Bidders are urged to consult the Contract Documents before submitting a proposal. Those documents include, among other things, liquidated damage provisions. The successful bidder will be required to furnish Contractor Liability insurance certificates in amounts to cover contractor liability for work to be completed. All policies shall be in the amount and form and written by companies satisfactory to the Board. All certificates of insurance shall be delivered to the Board prior to commencement of any operation. Des Moines Water Works is a "Designated Exempt Entity" recognized as such by the Iowa Department of Revenue. Bidders shall not include in proposal amounts payable by Contractor, any subcontractor, or the Board on account of taxes imposed by any taxing authority upon the sale, purchase, or use of materials, supplies, and equipment covered by the Contract or any equipment supplied pursuant to the Contract. A Tax Exemption Certificate and Authorization Letter will be provided to the Contractor and any subcontractors and shall be used to secure all building materials, supplies, and equipment intended for completion of this Contract without payment of sales or use tax by the Contractor or any subcontractors. The Board reserves the right to reject any or all bids and to waive informalities in any bid. The Board also reserves the right to accept the bid that it determines to be in the best interest of the Board in accordance with Chapter 26 and Subchapters II and III of Chapter 73A, Code of Iowa. As of September 6, 2023, no rebid information available

Final Planning

Water / Sewer

$250,000.00

Public - City

Renovation, Site Work

18

13

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
40
Bidding Soon
450
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

August 19, 2024

img_map_placeholder

Multiple Locations, Des Moines, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.