BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an elderly care / assisted living facility in Littleton, Massachusetts. Working plans call for the construction of a 17,000-square-foot elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.

Littleton Senior Center - Construction Management at Risk - Request for Qualifications The Town of Littleton is seeking Construction Management at Risk services. This is the first part of a two-phase selection process. Please see the RFQ document for any additional information. There will not be a briefing session for this phase of the process. Please contact the OPM for any questions. Based upon a need identified by a previous Town Hall Space Needs study and long time desire by the Town for a new Senior Center, the new Shattuck Center will be constructed on Town property adjacent to 31 Shattuck Street and across the parking lot from the new Reuben Hoar Library. The current site was chosen based upon more favorable cost estimates than a earlier study that placed a new building on the hillside site behind the current Town Office Building at 37 Shattuck Street. The approximately 17,000sf new building will be wood and steel construction built into the existing slope, handicapped accessible, with two levels and elevator. The exterior will be fiber cement clapboard and paneling, with an asphalt shingle roof. All new building systems will be required including mechanical, electrical, plumbing, fire protection, andsecurity systems. Complete site work is required including excavation, on-site storm drainage, additional drives and parking. Any questions about uploading of information should be directed to the OPM bfors@vertexeng.com by August 25, 2022. Answers will be distributed to all plan holders via addenda. Project Team: OPM: The Vertex Companies, LLC Project Director: Jon Lemieux, PE Project Manager: Bryan Fors Designer: LLB Architects Senior Principal: R. Drayton Fair Principal: Suzanne DiSalvo Principal: Brian Valentine Respondent must attach here a letter from a surety company (or from an agent meeting the criteria set forth above) evidencing that the surety will provide respondent with payment and performance bonds for the Project in an amount equal to or greater than 110% of the estimated construction cost of the Project. The surety company must meet the requirements set forth above. There will be no RFQ Informational Meeting for this stage of the selection process. Shortlist determined W/E September 9, 2022 RFP issued to shortlisted firms September 12, 2022 Informational Meeting September 15, 2022 Proposals received September 22, 2022 Interviews (Interview may be in person or remote) W/E September 30, 2022 Highest ranked proposer determined W/E October 7, 2022 Finalize CM contract W/E October 14, 2022 Sixteen (16) months for all phases of the work including new construction and associated site work. CM will work with Owner to determine necessity of Early Release Packages. The PMBC reserves the right to reject without evaluation of the RFQ if the submission is not prepared and submitted per the requirements stated herein. The PMBC reserves the right to waive minor informalities.

Final Planning

Elderly Care / Assisted Living

$15,000,000.00

Public - City

New Construction, Site Work

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
622
Active Projects
383
Bidding Soon
4,985
All Active Projects
2,071
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 1, 2022

May 1, 2023

September 1, 2024

img_map_placeholder

33 Shattuck St, Littleton, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.