BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 5, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Watertown, Connecticut. Completed plans call for site work for a water / sewer project.

Munson House Water Service Pipe Replacement To receive consideration bids must be in the hands of the Purchasing Agent or his authorized representative no later than the day and hour mentioned above. Proposals must be submitted on the forms provided and in a sealed envelope plainly marked "Bid - Munson House Water Service Pipe Replacement". For further administrative information contact Donna Ford, Purchasing Agent at (860) 945-5260 or via email at ford@watertownct.org The Town of Watertown reserves the right to take into account the residency of bidders within the Town of Watertown and/or the location of the bidder's business within the Town of Watertown in awarding this bid. All bids will be considered valid for a period of sixty (60) days. PERFORMANCE BONDS / PAYMENT BONDS A performance bond is required and shall be in the amount of 100% of the bid award, in the name of the "Town of Watertown", in the form and with a surety company approved by the State Commissioner of banking and insurance, and issued within ten (10) calendar days of the bid award date. Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Connecticut. This financial instrumentshall be for the faithful performance of the contract, and shall be used at the sole discretion of the Town of Watertown to pay liquidated Damages for failure or refusal to perform in accordance with the contract. No withdrawals shall be made until after five (5) calendar days notice of noncompliance with the contract is sent by certified U.S. Mail. This in no way limits further actions the Town of Watertown may take The Purchasing Agent reserves the right to accept or reject any or all bids; to waive any informality; or to accept any bid deemed in the best interests of the Town of Watertown. The Contractor shall provide all labor, superintendence, materials, plant, tools and equipment necessary for the proper completion of installing a new one-inch copper water line from the 10" water main located in Route 6 to a point inside the foundation, at approximately its present location. The total length is approximately 250 feet. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Water / Sewer

$54,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
871
Active Projects
384
Bidding Soon
6,356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2022

October 20, 2022

Project location map

US-6, Watertown, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.