BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 28, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a civil project in Minong, Wisconsin. Design plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

As of December 28, 2022, an engineer selected and this project is in design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to September 2023. *The closed solicitation has been included below for reference: Transportation Region/Bureau: Northwest Region Solicitation ID: NW-06 Anticipated Construction Cost: $2,000,000-$2,999,999 Route : Cth Y to Cth M (Sb) County : 16 - Douglas County Limit : Mn/wi State Ln to Sth 35 S The pavement needs treatment to extend its service life and culvert need replacement Perpetuation project of 4.00 miles on USH 53, from CTH Y to CTH M (SB), Town of Gordon, in Douglas County. Work includes resurfacing and concrete pavement repairs and asphalt shoulder resurfacing on southbound and northbound lanes. Additional work includes resurfacing of existing asphalt turn lanes, culvert work, tree clearing and pavement markings. The work will be done under traffic utilizing single-lane closures. The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found at Website. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Minong - Solon Springs *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
45
Bidding Soon
473
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

Project location map

US-53, Minong, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.