Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2024 at 8:00 PM

Updated June 6, 2024

Site work and paving for a road / highway in Minong, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Misty Bog Road -20 Wide by 2 Thick Warm Mix Rolled, Starting Point Will Be 3/10 Mile N of Mosquito Dr on Misty Bog Rd Going South for .5 Miles. This Bid Needs to Be Sealed and Marked "lrip Blacktop Bid" a Certificate of Insurance is Required. Town Reserves the Right to Accept or Reject Any or All Bids. **project Must Be Completed By October 15, 2024**

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
40
Bidding Soon
616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 5, 2024

Project location map

Misty Bog Rd, Minong, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed