BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a road / highway in Minong, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Poly Fiber Flex Patch For further information please con- tact Andy Balcsik, Acting Highway Foreman, by calling 715-816-0827. The Town of Wascott reserves the right to accept or reject any or all bids or any part(s) thereof, waive any informalities in the bidding process, and to accept the bid proposal or portion of a bid proposal deemed most advantageous to the Town. 1. DOT Standards - All contracting procedures, work and materials supplied under this proposal, shall conform to the Standard Specifications for Highway and Structure Construction, 2018 edition of the Wisconsin Division of Highways, Department of Transportation, and Trans 204, Wis. Admin. Code. 2. Contract for Work - The work shall consist of furnishing all materials, equipment and labor for Poly Fiber Flex Patch. 3. Production - The contractor shall provide adequate trucks equipment and traffic control. Roads- 1. Cranberry Lake Road Landing from Crystal Lake Road to end . 2. Miles Lake Road from Cty Rd T to Town Line Work shall be completed by August 31, 2025. For Poly Fiber Flex Patch with Precoated Stone and Blower Application Precoated Aggregate - Specification and Process for Production, Application with Flex Patch - Field precoating of aggregate shall not "be allowed Precoat aggregate using hot mix asphalt plant mixing method. Mixing plant must be drumtype with capability to heat aggregate and bitumen to required temperaturesto achieve required results. Equipment and procedure used for precoating must ensure that the bitumen is uniformly applied to aggregate. Aggregate shall be heated and dried to biturhen application in plantto eliminate moisture and dust priorto precoating. Aggregate is to be clean and dry prior to bitumen application. Use of adhesion agents is not allowed. Asphalt binders for precoating aggregates shall be asphalt cement (AC). The target value ofprecoating material typically varies from 0.80 to 1.50 percent (by weight), ofresidual binder on the aggregate. Provide aggregate with a uniform coating ofbitumen for use. Custom Bid Results Cranberry Lk Rd Landing Roy’s Sealcoating - $5,800 Miles Lk Rd from Cty Rd Fahrner - 8,165;

Award

Roads / Highways

$13,965.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
27
Bidding Soon
471
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2025

June 18, 2025

Project location map

Multiple Locations, Minong, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.