EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Mundelein, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work shall consist of roadway resurfacing including 20,309 pounds of Bituminous Materials (Prime & Tack Coat), 865 tons of Hot-Mix Asphalt Surface Course, Mix D, IL-9.5, N50, 1,100 tons of Hot-Mix Asphalt Binder Course, IL-19.0, N50, 8,315 square yards of Hot-Mix Asphalt Surface Removal (var. types), and other related work. Prequalification of Bidders in accordance with the applicable parts of IDOT Bureau of Local Roads and Streets Recurring Special Provision Bidding Requirements and Conditions for Contract Proposals" (Check Sheet LRS 6) will be required of all bidders on this proposal. Not less than the prevailing rate of wages as found by the Village or the Department of Labor, or as determined by the Court on Review, shall be paid to all laborers, workmen, and mechanics performing work as indicated in the special provisions to the specifications. MBE/WBE/PBE firms are encouraged to submit proposals. All proposals must be accompanied by a proposal guarantee in the amount of not less than five percent of bid, or as provided in applicable parts of Bidding Requirements and Conditions for Contract Proposals (Check Sheet LRS 6). The right is reserved to reject any or all proposals and to waive technicalities. This project consists of the resurfacing of various streets within the Diamond Pointe Subdivision including Diamond Pointe Drive, Fountainview Drive and Walnut Street, in the Village of Mundelein as shown on the location maps and in the Project Summary. The total length of the improvement is 2.280 feet or 0.43 miles. The work shall include, but not limited to, hot-mix asphalt surface removal, hot-mix asphalt surface course, concrete curb and gutter replacement, and all incidental and collateral work necessary to complete the project as described herein

Bid Results

Roads / Highways

$312,213.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
171
Bidding Soon
2,720
All Active Projects
1,158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

September 29, 2022

img_map_placeholder

Multiple Locations, Mundelein, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Contract B Streets Resurfacing

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.