BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Claremont, New Hampshire. Contact the soliciting agency for additional information.

The City of Claremont is requesting bids for the general maintenance for summer and winter of the Santagate Bridge, various steps and ramps on Water Street, Crescent Street, Fiske Free Library, and Visitors Center areas. Such winter maintenance will include, but not limited to, the following; Sidewalk and stair(s) snow clearing, as needed; to ensure pedestrian safety, in and around, Water Street, Crescent Street, Visitors Center, and the Fiske Free Library (As defined in attached aerial photos) Clearing snow/ice/debris on Santagate Bridge and some areas around the Visitors Center *** (As defined in attached aerial photos) Snow clearing/treating, as needed, on Water Street stairs, ramps, crosswalks, & sidewalks (As defined in attached aerial photos) Walkways in the front (Broad Street) and side (Barber Street) of the Fiske Free Library, including ramp, & the sidewalk and tip-down in sidewalk connecting the two walkways (As defined in attached aerial photos) Salting and sanding as needed; to ensure pedestrian safety Such summer maintenance will include, but not limited to, the following; Lawn care of the Visitors Center area (weekly); as defined in attached aerial photos Lawn care of sides of road and entrance off Grissom Lane on Syd Clarke Park (monthly); as defined in attached aerial photos Lawn care of sides of road on Ashley Landing (monthly); as defined in attached aerial photos *** The material used on the Santagate Bridge must be Green Scapes Ice Melter, (or approved equivalent), to ensure no chemicals are deposited into the water below. Contractor shall be responsible for furnishing all materials, tools, equipment, labor and other services necessary to accomplish such tasks. The term of the agreement will be from October 1st, 2022 to September 30th, 2024. With the ability to negotiate and extend another two (2) year agreement.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
160
Bidding Soon
3,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

October 1, 2022

Project location map

Multiple Locations, Claremont, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.