Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 10, 2022 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a water / sewer project in Montross, Virginia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Coles Point WWTP Drip System Project consists of a small pump system and approximately 11,500 sf of 2" HDPE pipe to be directionally drilled. The system will pump treated wastewater to a 52,000 gpd drip system. The drip system will include tanks, pumping system tubing and generator and SCADA system.

Award

Water / Sewer

$1,585,950.00

Public - County

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

Project location map

To Be Determined, Montross, VA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed