Site work for a water / sewer project in Montross, Virginia. Completed plans call for site work for a water / sewer project.

Town of Montross 15869 Kings Highway Montross, VA 22520 Attn: Patricia Lewis, Town Manager Montross Waterline Improvement Sealed Bids for a water of distribution system upgrades generally consisting of 520 feet of 12-inch PVC, 225 Feet of 12-inch HDPE, 9,700 feet of 8-inch PVC, 1,358 feet of 8-inch HDPE, 332 feet of 6-inch DIP, 3,750 feet of service laterals, 14 fire hydrants, valves, and fittings. Bids received after this time will not be accepted. Bids may be withdrawn in accordance with applicable provisions of the Code of Virginia. A Certified Check or Bid Bond drawn to the order of the Town of Montross in an amount equal to five percent (5%) of the amount bid must be submitted with the proposal as bid security. All proposals shall be submitted in accordance with the Instructions to Bidders, Article 13 Preparation of Bid Submission - to be found in the Instruction to Bidders. The successful bidder for this contract must furnish a 100 percent Performance Bond, and a 100 percent Labor and Material Bond. Each Bidder is required to submit an experience and equipment list with their bid. Town of Montross hereby reserves the right, which is understood and agreed to by all Bidders, to refuse any or all bids submitted; and also reserves the right to waive any informality in bids received, but any contract awarded will be to the lowest responsive and responsible bidder. No Bidder may withdraw his bid within sixty (60) calendar days after the actual date of the bid opening. The Work will be substantially completed within 270 days ; final completion within 300 days after the date when the Contract Times commence to run. 1 Mobilization/Demobilization 2 12" C-900 PVC Pipe and fitting 3 12" HDPE D.D. Pipe and fitting 4 8" C-900 PVC Pipe and fitting 5 8" HDPE D.D. Pipe and fitting 6 8" Gate Valve 7 8" Cap 8 Service Laterals 9 Service Connection including corporation stops and meter box connection 10 6" Dip F.H. Service Line and fitting 11 Fire Hydrant Assembly 12 Connection to existing System 13 Flushing, Testing and Bacterialm Testing

Award

Water / Sewer

$2,288,697.00

Public - City

Site Work

21

12

48

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
153
Bidding Soon
2,717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

December 5, 2022

Project location map

Multiple Locations, Montross, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.