BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Arminto, Wyoming. Completed plans call for site work for a water / sewer project; and power facility.

Installation of Prefabricated Stairs and Landings below Glendo Dam The range of this project is Less than $25,000 The North American Industry Classification System (NAICS)code is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $39.5 Million. Product or Service Descriptions - PSC: Y1PZ-Construction Of Other Non-Building Facilities. This project is issued for Total Small Business Set Aside. Quotes will be received via email to: Linda Melnick lmelnick@usbr.gov Destination Period of Performance: 09/01/2022 to 10/31/2022 SCOPE The Bureau of Reclamation (Reclamation) is seeking a contract for installation of two Reclamation -furnished prefabricated metal staircases and landings on the west bank of the North Platte River downstream of the Glendo Powerplant. 2. BACKGROUND Reclamation personnel perform river flow measurements utilizing the river gage cableway downstream of Glendo Dam. The stairs and landings will improve personnel access to the river gage cableway on the uphill side and to the river on the downhill side for river flow measurement. Figures 1-5 show a map and site details. 3. TASKS The contractor shall perform the following tasks: a. Relocate Reclamation-furnished stairs and landings to installation site i. Access is through locked gate and requires Reclamation personnel to open gate. ii. Relocate the prefabricated stairs, landings, and appurtenances from near the Glendo Powerplant approximately 0.9 miles downstream to the site of installation. iii. Contractor provides all labor, equipment, hardware, and materials to transport the stairs and landings, to assemble them, and to install them onsite. b. Install upper stairs and landing i. The upper landing is to be located on the west side of the access road against/into the hillside such that the landing and stairs do not block the access road. ii. The floor of the landing should be approximately 5 ft below the cable. iii. The stairs should be installed centered in the opening in the handrail of the landing. This will leave a gap between the stair handrails and the landing handrails. iv. Sonotube (or equal) with concrete at least 12 inches in diameter and 2-3 ft deep should be used to secure the legs. v. If the platform height is such that the base of one or more legs will be at or above ground surface, anchor bolts should be fastened into the concrete to bolt the base of the legs to the concrete. vi. The platform legs should be cut as necessary to conform to the slope of the hillside, with the cut legs going into sonotube 2-3 ft deep into the ground and have concrete filling the sonotube around them to secure the structure. PERIOD OF PERFORMANCE Installation should be completed between September 1, 2022 and October 31, 2022. During this period of time the flow in the river may vary considerably (from several thousand cubic feet per second [cfs] down to 25 cfs). Irrigation deliveries from Glendo Dam typically conclude around mid-September, but it is currently unknown when deliveries will end in 2022. River flows below Glendo Dam are expected to be around 25 cubic ft per second after September 30, 2022.

Post-Bid

Water / Sewer

$25,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
1
Bidding Soon
35
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

September 8, 2022

img_map_placeholder

To Be Determined, Arminto, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.